Ground-mount solar and private wire

Where land is available, ground-mount arrays deliver scale, optimal orientation and the lowest cost per kWh.

When roof space runs out or the roof cannot take the load, land can. Ground-mount arrays allow optimal tilt and orientation, straightforward maintenance access and scale that rooftop rarely reaches — and a private wire connection can deliver that power directly to an adjacent factory, estate or data hall.

Land, planning and grid come first

A ground-mount scheme lives or dies on three constraints: usable land free of flood, heritage and ecology issues; a planning route that a local authority will support; and a grid position that allows either export or private wire supply at the capacity you need.

We appraise all three before design work begins, so time and fees are only spent on schemes that are genuinely deliverable.

Private wire: the strongest commercial case

Supplying an adjacent site directly over a private wire avoids network charges and levies that make up a large share of a delivered electricity bill. Where the geography works, this is usually the most valuable structure available.

We model the split between private wire supply, export under a PPA and curtailment, then structure the arrangement so both generator and offtaker have a durable, bankable position.

Biodiversity and land use

Well-designed schemes run sheep grazing, wildflower margins and hedgerow planting alongside generation, supporting biodiversity net gain requirements and making planning consent considerably more straightforward.

What we assess

The checks behind the recommendation.

Land appraisal

Flood zone, grade, ecology, heritage, access and topography.

Grid capacity study

Point of connection, available capacity and reinforcement cost.

Planning strategy

Pre-application engagement, landscape and visual assessment, BNG plan.

Private wire feasibility

Route, wayleaves, metering and supply arrangement to the offtaker.

Offtake structure

Self-supply, sleeved PPA or export — modelled against forward curves.

Construction programme

Ground conditions, piling strategy, DNO works and energisation dates.

Ready to test the numbers on your site?

We will model yield, self-consumption, funding routes and payback using your own consumption data — independently, and with no obligation.